DEP 80001010
The separation distances have in general been arrived at through consequence modelling of relevant failure scenarios (e.g., tank top fire, or loss of containment via a 25 mm (1 inch) hole in a pressurized system), giving distances to blast
overpressures and radiation levels.
GS EP SAF 253 Fire zone
20 mm (1) leak diameter
- Corresponds to ¾ inch fitting rupture scenario (rounded to the nearest upper natural number)
SP-1258 QRA & PEM
Generally 22mm hole size covers about 90% of the leak frequency of an isolatable segment/equipment. It had been a practice in PDO to apply 22mm as credible hole size for different PEM calculations.
'내일 공부' 카테고리의 다른 글
| Plant Layout Development Procedure and the responsibility of PSE (0) | 2025.06.19 |
|---|---|
| Safety distance를 준수하지 못할 때 어떤 방식으로 justification을 할 수 있을까? (0) | 2025.06.16 |
| SIMOPs (0) | 2025.06.15 |
| QRA와 FERA의 차이점 (0) | 2025.06.15 |
| Fire Protection Strategy: (3) How to estimate the depressurizing rate (0) | 2025.06.14 |